At GK Expertise, we specialize in comprehensive BESS (Battery Energy Storage System) Installation, Testing & Commissioning services. We manage every phase—from site preparation to final handover—to deliver a seamless, secure, and regulation-compliant integration of your energy storage system.
Our BESS Installation, Testing & Commissioning process includes:
Site Assessment & Preparation
Evaluate environmental and structural prerequisites
Coordinate civil, electrical, and mechanical groundwork
Ensure compliance with local regulations and safety standards
System Installation
- Precision placement of battery modules, inverters, transformers, and switchgear
- Secure mounting, cabling, and grounding in accordance with design specifications
- Integration with existing electrical infrastructure (e.g., grid, microgrids, or renewables)
Pre-Commissioning Checks
- Visual and mechanical inspections (torque settings, cable continuity, grounding)
- Battery health assessment (voltage, temperature, state-of-charge)
- Verification of protective devices, interlocks, and redundant systems
Functional Testing
- Validation of power inputs/outputs, inverter operation, and protection logic
- Communication checks with SCADA/EMS/BMS protocols (CAN, Modbus, IEC 61850)
- Simulation of contingencies such as islanded operation, grid disturbances, and emergency shutdown
Performance Verification & Commissioning
- Load testing and performance benchmarking
- Fine-tuning operational parameters for efficiency and reliability
- Commissioning report documentation and as-built drawings
Handover & Training
- On-site operator training on system operation, safety protocols, and emergency procedures
- Preparation of O&M manuals, SOPs, and maintenance checklists
- Post-commissioning support during the initial operational phase
Contact GK Expertise for reliable and expert BESS Testing and Commissioning Services available across India. Ensure safe, efficient, and compliant system deployment with our end-to-end support.